Barn Site

Page 1  |  Page 2
n670838810_696654_2510
Slab preparation.
n670838810_696655_2868
Trenches in.
n670838810_696657_3408
7:00 on a freezing Saturday morning, the concrete is almost poured.
n670838810_696656_3138
A slab!
DSCN4514.JPG
Well packed kit bits
DSCN4515.JPG
Every piece is lettered and numbered
DSCN4516.JPG
precision manufacturing.
DSCN4517.JPG
Take that termites.
DSCN4518.JPG
The instructions, the packing list is very important for working out what goes where.
DSCN4521.JPG
Basic tools are all that is needed, childs play.
DSCN4523.JPG
The first Tru-bolts go in.
DSCN4563.JPG
String lines set up to get it square.
DSCN4565.JPG
DSCN4574.JPG
First frame ready to raise, took a bit of lifting and shoving to get it into position, did this by myself another pair of hands makes it much easier.
DSCN4578.JPG
Pivot points
DSCN4580.JPG
DSCN4581.JPG
DSCN4585.JPG
Standing up, had some help from a neighbor
DSCN4586.JPG
Towed up with the trusty Kombi.
DSCN4587.JPG
Brace in
DSCN4588.JPG
I found that tapering the bolts helped them go in.
DSCN4590.JPG
Hi lift jack to help with aligning some holes
DSCN4592.JPG
Two up
DSCN4598.JPG
DSCN4601.JPG
Some bracing in
DSCN4602.JPG
All frames standing, really very easy to get this far, my first building project!
DSCN4611.JPG
Bottom plate for the annex wall.
DSCN4613.JPG
DSCN4615.JPG
DSCN4616.JPG